top of page
Land, Building & 3D Surveys. Site Engineering.
Yate International Academy - Q&A
Working as the in-house survey/engineering team... The Yate International Academy in Bristol is a site Lansdowne were involved with for...
Land Survey - Cotswolds WP
Large scale land survey; building a Hydrology Model Over the course of three months a large scale land survey was carried out on the...
Elevations, Floor Plans & a Topo
A three part survey... Our clients requested a survey of a property in Bristol. The survey would be in three parts: elevations, floor...
Groundworks - Longleat Center Parcs
building Tree Houses at Center Parcs ... Groundworks is very much part of the bread & butter of what Lansdowne do, however building these...
As-Built Survey
the final As-Built... It’s believed Phoenix Engineering have been involved with more Leachate Treatment Plants than any other...
Slab Survey
a before & after concrete slab survey... The Bristol Port Company requested a Level Survey across a concrete slab in one of their...
Velodrome - London 2012 Olympic Venue
The instruction from the client was to survey the structural steel frame and recently installed Lufftrack between the back of the stadium...
Basketball Arena - London 2012 Olympic Venue
Ironing out the wrinkes... As you can see from the pic above the steel frame has a high tensile fabric material stretched over it....
Piling
the calculaton, Setting-out and as-built of 13,000 piles... Over an 18mnth period three Lansdowne engineers were responsible for the...
Rail Survey
Sections through the railway.. Following an embankment slip, a section of railway (two lines) in Somerset had been re-modelled, the...
Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
bottom of page