top of page
Search

Levelling inspection pits

  • Jay Wheeler
  • Aug 23, 2013
  • 1 min read

​​​

The four hgv inspection pits in the picture above are being levelled into place, each leg of the pit must be within a mm of those around it. Once in place the pre formed pit liner is poured with concrete and the pit is set into position.


 
 
 

Comentarios


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2015 by Lansdowne Surveys. Proudly created with Wix.com

  • Facebook Basic Black
  • Twitter Basic Black
  • LinkedIn Basic Black
bottom of page